Quick answer

Cubic yards = length (ft) × width (ft) × thickness (in) ÷ 324, plus 5–10% extra. A 10 × 10 ft slab 4 in thick is 1.23 cu yd, or about 1.36 cu yd with 10% extra: 62 bags of 80 lb or 1½ yards of ready-mix. Above roughly 1 cubic yard, ready-mix is usually easier and often cheaper than bags.

Parts of the pour
Prices (edit to match your area)

Concrete for common slabs (+10%)

SlabCubic yards80 lb bags60 lb bags
10 × 10 ft × 4 in1.366282
10 × 12 ft × 4 in1.637498
12 × 12 ft × 4 in1.9689118
20 × 20 ft × 4 in5.43245326
12 × 24 ft × 5 in4.89220294
20 × 24 ft × 6 in9.78440587

How thick should concrete be?

UseThickness
Walkways, patios, shed floors4 in
Driveways (cars)5–6 in
Hot tub pads, RV parking6 in
Garage floors4–6 in, per local code

Frequently asked questions

How do I calculate how much concrete I need?

Multiply length × width × thickness in feet for cubic feet and divide by 27 for cubic yards. With thickness in inches, multiply length × width in feet by the thickness in inches and divide by 324. Add 5–10% for spillage and uneven ground.

How many bags of concrete are in a yard?

About 45 bags of 80 lb (0.6 cu ft each), 60 bags of 60 lb or 90 bags of 40 lb make one cubic yard.

When should I order ready-mix instead of bags?

Above about 1 cubic yard, mixing 45+ bags by hand is hard work and ready-mix is often cheaper. Below 2–4 yards, many suppliers add a short-load fee; enter it to compare.

How much concrete does a truck hold?

Most ready-mix trucks carry up to about 9–11 cubic yards. Bigger pours need several trucks scheduled back to back.

Do I need rebar in a concrete slab?

Many 4 in patio slabs use welded wire mesh or fiber-reinforced mix; driveways and structural slabs often use #3 or #4 rebar at 12–18 in on center. Follow your local code and engineer for structural work.

Run a garden club, nursery or landscaping site? Embed this calculator free with one line of code.

Related free tools

Sources and assumptions

Volumes: slabs and footings length × width × depth; columns π r² h; steps width × run × rise × n(n+1) ÷ 2. Bag yields from premixed concrete labels (80 lb 0.6 cu ft, 60 lb 0.45, 40 lb 0.30). Fresh concrete weighs about 4,050 lb per cu yd. Typical thickness: 4 in for patios and walks, 5–6 in for driveways and heavier loads. Rebar laps of about 18 in; welded wire 5 × 10 ft sheets. Structural work must follow your local code.